November 17, 1996 · 15 m · CW

Front

Back
Automatic transcription (OCR), may contain errors.
Front: QSL Archive by ik6bak 7P8/G4FUI QSL Archive ik6bak 7P8/G4FUI
Back: The photograph shows the Katse Dam as it was nearing To Radio completion. This dam is the pivotal component of the Lesotho Highlands Water Project designed to provide much needed water for South Africa's industrial Transvaal Confirming our CW QSO on 21.010 MHz area and revenue for the Government and people of R.S.T. 5.6.9 Lesotho - a tiny country (about the same size as Belgium) 14:28 17-XI - 1996 at entirely surrounded by its larger neighbour, the Republic of UTC Date: South Africa. Additionally a hydro-electric power station will generate about 90MW of electricity for Lesotho itself. pse / tnx QSL/SWL report via The photograph shows the Katse Dam as it was nearing To Radio completion. This dam is the pivotal component of the Lesotho Highlands Water Project designed to provide much needed water for South Africa's industrial Transvaal Confirming our QSO on 21.010 MHz area and revenue for the Government and people of R.S.T. 5.6.9 Lesotho - a tiny country (about the same size as Belgium) 14:28 17-XI - 1996 at entirely surrounded by its larger neighbour, the Republic of UTC Date: South Africa. Additionally a hydro-electric power station will generate about 90MW of electricity for Lesotho itself. pse / tnx QSL/SWL report via
Detected automatically by image recognition, may contain errors.